Unterkulm · June 2022

KWC Group AG

Industry, Commerce & Residential BuildingsRefurbishmentsCustom Solutions
The project

New light across 26'141 m² of tap production — hall by hall, without a standstill

A step-by-step refurbishment during ongoing operations. 40 % fewer light points, 344 MWh less energy, supported by ProKilowatt.

We recorded every light point on the KWC Group site in Unterkulm, assessed it against the standards and developed a lighting concept from it that keeps the existing infrastructure in use. The refurbishment ran hall by hall during ongoing operations — from production through logistics into the offices, closely coordinated with everyone on site wherever that was needed. All applications are designed to SN EN 12464, verified to SIA 387/4 and fully documented. With 40 % fewer light points the energy demand falls by 344 MWh a year, ProKilowatt funded 30 % of the investment, and the payback is under four years. Because the luminaires in the positions with long operating hours are built ready-to-repair, spare-part management stays assured in the long term.

Core tasks
  1. Development of design sketches and variants
  2. Preparation of the relevant product certifications
  3. Site survey and assessment against the relevant standards
  4. Energy verifications to SIA 387/4
  5. Preparation of the lighting calculation to SN EN 12464, 12193, 13201 and SLG guidelines
  6. Preparation of documentation for subsidy applications
  7. Support and briefing of the installers
  8. Delivery of all luminaires and components for implementing the lighting project
Services provided
Lighting designBuilding refurbishmentFunding programmes
Facts & figures
Area
26'141 m²
Payback
< 4 years
Energy saved
344 MWh
Light point reduction
40 %
Funding
30 % of the investment
Project duration
12 months
Core products
Aletsch light-line insert